A.70 Sullivan's Ledge, MA
A.70.1 Summary
|
Environment: |
Brackish marsh areas |
|
Scale: |
|
|
Contaminants of Concern: |
PCBs, PAHs |
|
Final Remedy: |
Removed sediment with backhoes and long reach excavators and trucked dredged material to treatment pad on site for stabilization. This included an addition of 20% lime kiln dust by volume and up to 10% sand by volume then mixed. Contaminated material was capped on site. |
A.70.2 Site Description
Year: 2001
Estimated debris content of 40-80% in OU 1.
OU 2 wetlands are within a 25- and 100- year floodplain of unnamed stream.
Actual Volume Removed: 35,200 yd3 in OU 1 and OU 2
A.70.3 Remedial Objectives
15 mg/kg total PCBs
Contaminated sediment area:
OU 1: 12 acres of disposal area, unnamed stream, and 2 golf course water hazards
OU 2: 7 acres of wetland
A.70.4 Remedial Approach
Backhoes and long-reach excavators were used for dredging.
A.70.5 Monitoring
Resuspension:
Silt fencing was used for erosion control. Air monitoring to ensure no suspension of contaminants.
Performance: Goals were not met.
Residuals:
The sediment cleanup criterion was determined to be impractical following review of initial confirmation sample results.
A.70.6 References
New England Environmental, Inc. 10-Acre Wetland Restoration Sullivan’s Ledge Superfund Site New Bedford MA. http://www.neeinc.com/projects/ecological-restoration/sullivans-ledge-superfund-site/.
USEPA. Five-Year Review Report for Sullivan’s Ledge Superfund Site. Sep 2003. http://www.epa.gov/superfund/sites/fiveyear/f03-01009.pdf.
USEPA. Second Five-Year Review Report for Sullivan’s Ledge Superfund Site. Sep 2008. http://www.epa.gov/superfund/sites/fiveyear/f2008010002480.pdf.
Major Contaminated Sediment Sites Database; Sept. 2004 as updated 2008. http://www.smwg.org/MCSS_Database/MCSS_Database_Docs.html.
Publication Date: August 2014